Read blueprints, drawings and specifications to determine work requirements.
Supervise other workers.
Apply successive coats of compound and sand seams and joints.
Apply, level and smooth coats of plaster.
Cure freshly plastered surfaces.
Cut and install metal corner beads to protect exterior corners.
Fabricate and install suspended metal ceiling grids and place in panels to form acoustical and coffered ceilings.
Fill joints, nail indentations, holes and cracks with joint compound using trowel and broad knife.
Measure, cut, fit and install drywall sheets.
Mix plaster ingredients to desired consistency.
Position and secure sheets to metal or wooden studs or joists.
Smooth out excess compound and allow coat to dry.
Spray acoustic or texture materials over walls and ceilings.
Tape over joints using taping machine and embed tape in compound.
|